Period 1 Deliverables Table.

NOTE: This table is no longer used and is here only for archival purposes. Please find the Period 2 Deliverables table for the most recent information.






Source Files used to create table

  • Description of Work
  • The Deliverables Spreadsheet. [note: 2007 Jan, this document is currently out of date. The spreadsheet will not be updated regularly until after the annual review. Apologies in advance for removing the link to this document.
  • Note: the below table is based on the Description of Work. A new deliverables table is being created based on the modifications in the Period 1 Review.

Legend for table headings

D# == Deliverable #
A == Activity
AD# == Activity Specific Deliverable Number
Descrip == Deliverable description
Plan == Planned Delivery Month
Actual == Actual Delivery Month
Status == Current Status ( x of 4 )
Nature == Nature
DisLev == Dissemination Level
Lead == Lead Consortium Member

Note: see the end of this document for further information about the information in each of the columns.

Deliverables Table (version from Plan for Months 1-18)

D# A AD# Descrip Plan Actual Status Nature DisLev
D1NA4NA4.01Creation of Public EXPReS web-site 2 1 4 O PU
D2JRA1J1.1Data acquisition requirements document 2 3 4 R PU
D3JRA1J1.2Protocols strategic document 2 2 4 R PU
D4NA2NA2.01EVN-NREN meeting No. 1 (under auspices of EXPReS) (minutes) 3 6 4 R PP
D5SA1SA1.1Central data link control, Correlator Control Code modifications (not documented) 3 7 4 D PU
D6NA3NA3.1First meeting of eVSAG under auspices of EXPReS (minutes) 4 9 4 R PP
D7NA4NA4.02Creation of EXPReS web-based management tools 4 4 4 O PP
D8JRA1J1.3Visualization software 4 —> PPU
D9JRA1J1.4Correlator design specification 1) 5 3 RPU
D10NA4NA4.03Generation of PR material (phase 1: logos and posters, PowerPoint template, press releases and news clippings, brochure) 6 1 x O PU
D11SA1SA1.2Job preparation utilities 6 2 D PU
D12SA1SA1.3Fast/adaptive scheduling tools 6 1 D PU
D13SA2SA2.01Feasibility study (via protected link) of the last-mile connection to the nearest NREN node for participant CNIG-IGN 6 9 4 R PU
D14SA2SA2.02Feasibility study (via protected link) of the last-mile connection to the nearest NREN node for participant MPIfR 6 9 4 R PU
D15SA2SA2.03Equipment of the last-mile infrastructure for participant INAF (telescope in Medicina) (via protected link) 6 9 4 O PU
D16SA2SA2.04Feasibility study (via protected link) of the last-mile connections to the nearest GEANT NREN node for participant CAS (Shanghai, Urumqi, Miyun, Yunnan ) 6 9 4 R PU
D17SA2SA2.05Feasibility study (via protected link) of the last-mile connection to the nearest NREN node for participant VIRAC 6 9 4 R PU
D18SA2SA2.06Feasibility study (via protected link) of the last-mile connection to the nearest NREN node for participant HRAO 6 9 4 R PU
D19SA2SA2.07Feasibility study (via protected link) of the last-mile connection to the nearest NREN node for participant NAIC (Arecibo) 6 9 4 R PU
D20SA2SA2.08Feasibility study (via protected link) of the last-mile connection to the nearest NREN node for participant TIGO 6 9 4 R PU
D21SA2SA2.09Feasibility study (via protected link) of the last-mile connection to AARNET for participant CSIRO 6 9 4 R PU
D22JRA1J1.5Overall design document6 0 RPU
D23JRA1J1.6eVLBI-Grid design document 6 9 4 R PU
D24JRA1J1.7eVLBI fringes PC-EVN (Month 7 Demo report) 7 7 4 D PU
D25JRA1J1.8LOFAR connection strategic document 7 11 4 R PU
D26JRA1J1.9Data acquisition design document 8 11 4 R PU
D27SA1SA1.4eMERLIN VSI interfaces design 9 1 P PU
D28SA1SA1.5Selective data processor controls 9 9 4 D PU
D29SA2SA2.10e-VLBI test observations, Medicina (256 Mbps fringes) (science announcement) 10 3 4 R PU
D30JRA1J1.10eVLBI-Grid interface document 10 10 4 R PU
D31NA2n/aNA2 annual report No. 2 (as part of EXPReS Ann. Rep No. 2)24
D32NA1NA1.01Annual report (incl. Financial information) to EC 12 RPP
D33NA2NA2.02NA2 annual report No. 1 (as part of EXPReS Ann. Rep No. 1)12 RPP
D34NA4NA4.04e-VLBI Demonstration and attendance at Network events (events, presentations) 12 12 x O PU
D35SA1SA1.5Network Protocol decision: A Simulation model for e-VLBI traffic on network links in the Netherlands,Comparing Simulation and Network Monitoring Results, On Network Monitoring of end-to-end paths used for e-VLBI, UDP-like TCP 12 2 D PU
D36SA1SA1.7Monitored information handling modules 12 D PU
D37SA2SA2.011Equipment of the last-mile infrastructure for participant MRO 12 5 4 OPU
D38SA2SA2.12Construction and equipment of the last-mile infrastructure for participant CNIG-IGN12 OPU
D39SA2SA2.13 Construction and equipment of the last-mile infrastructure for participant MPIfR12 OPU
D40SA1SA1.8Monitoring processes 12 7 4 D PU
D41JRA1J1.11Protocols performance report 2) 13 15 3 R PU
D42JRA1J1.12Software correlator core 14 6 3 P PU
D43JRA1J1.13Software data product15 PPU
D44SA1SA1.10Real-time data processor control software (no document) 15 4 4 P PU
D45SA1SA1.9Tests using local Jodrell Bank home e-MERLIN telescope 15 D PU
D46NA3NA3.2eVSAG meeting No. 216 RPP
D47SA1SA1.11Real-time Pipeline 16 9 4 D PU
D48NA2NA2.03EVN-NREN meeting No. 2 18 RPP
D49NA4NA4.05 Generation of new PR material (phase 2: display stand and merchandise)18 OPU
D50SA1SA1.12Visibility monitor 18 4 4 D PU
D51SA1SA1.13Tested software for operational improvements 18 0 D PU
D52SA1SA1.14Test using remote e-MERLIN telescope 18 D PU
D53SA1SA1.16 VSI support software 18 0 D PU
D54SA1SA1.15 VSI Interfaces 18 0 D PU
D55SA2SA2.1410 Gbps link upgrade between MERLIN and JIVE18 OPU
D56SA2SA2.15e-VLBI test observations, Metsahovi 18 13 4 R PU
D57SA2SA2.16Construction and equipment of the last-mile infrastructure for participant Shanghai18 OPU
D58SA2SA2.17 Construction and equipment of the last-mile infrastructure in AARNET to allow connection of participant CSIRO18 OPU
D59SA2SA2.18Construction and equipment of the last-mile infrastructure for participant Urumqi18 OPU
D60SA2SA2.19 Construction and equipment of the last-mile infrastructure for participant Miyun18 OPU
D61SA2SA2.20 Construction and equipment of the last-mile infrastructure for participant Kunming18 OPU
D62SA2SA2.21 Construction and equipment of the last-mile infrastructure for participant VIRAC18 OPU
D63SA2SA2.22 Equipment of the last-mile infrastructure for participant NAIC18 OPU
D64SA2SA2.23 Construction and equipment of the last-mile infrastructure for participant TIGO18 OPU
D65SA2SA2.24AARNET connectivity enhancements18 O PU
D66JRA1J1.14Data acquisition interface document18 RPU
D67JRA1J1.15LOFAR station interface report18 RPU
D68JRA1J1.16Software for workflow management18 2 PPU
D69SA2SA2.25Feasibility study of the last-mile connection to the nearest GÉANT node for participant INAF (Sardinia)20 RPU
D70SA2SA2.26 10 Gbps link between UniMan and OSO for ultra-VLBI tests20 OPU
D71SA1SA1.17 Flexible local GE network 21 1 D PU
D72SA2SA2.27e-VLBI test observations, Effelsberg21 RPU
D73SA2SA2.28e-VLBI test observations, Metsahovi22 RPU
D74SA2SA2.29e-VLBI test observations, Yebes22 RPU
D75JRA1J1.17Software for correlation on cluster23 2 PPU
D76JRA1J1.18Data acquisition test report23 RPU
D77JRA1J1.19Data acquisition prototype at telescope23 PPU
D78JRA1J1.20Overall broadband demonstration23 DPU
D79JRA1J1.21Software cluster correlation23 PPU
D80JRA1J1.22First fringes software correlator23 DPU
D81NA1NA1.02Annual report (incl. Financial information) to EC 24 RPP
D82NA2NA2.04NA2 annual report No. 2 (as part of EXPReS Ann. Rep No. 2)24 RPP
D83NA4NA4.06 e-VLBI Demonstration and attendance at Network events.24 OPU
D84SA1SA1.18Network monitoring tools 24 0 D PU
D85SA1SA1.19Multiple e-MERLIN telescope tests 24 D PU
D86SA2SA2.30 Construction and equipment of the last-mile infrastructure for participant HartRAO24 OPU
D87JRA1J1.23Software to collect distributed output24 PPU
D88NA2NA2.05EVN-NREN meeting No. 326 RPP
D89NA2NA2.06EVN-NREN representatives present EXPReS networking results at the e-VLBI Science & Technology Workshop 26 RPU
D90NA2n/aEVN-NREN meeting n/a
D91NA3NA3.3eVSAG meeting No. 326 RPP
D92JRA1J1.24Software to create data product from distributed correlation 27 PPU
D93JRA1J1.25Software routing29 PPU
D94NA3NA3.4e-VLBI Workshop held in Onsala30 OPU
D95SA1SA1.20 Improved network applications 30 0 D PU
D96SA1SA1.21Monitoring user interfaces 30 7 4 D PU
D97SA2SA2.31e-VLBI test observations, Urunqi30 RPU
D98SA2SA2.32e-VLBI test observations, Mijun30 RPU
D99SA2SA2.33e-VLBI test observations, Kunming30 RPU
D100SA2SA2.34e-VLBI test observations, VIRAC30 RPU
D101SA2SA2.35e-VLBI test observations, HRAO30 RPU
D102SA2SA2.36e-VLBI test observations, NAIC, Arecibo30 RPU
D103SA2SA2.37e-VLBI test observations, TIGO30 RPU
D104SA2SA2.38 Construction and equipment of the last-mile infrastructure for participant INAF (Sardinia)30 OPU
D105JRA1J1.26eMERLIN interface available30 PPU
D106JRA1J1.27Fringes with new routing31 DPU
D107NA3NA3.5Publication of e-VLBI Workshop proceedings32 RPU
D108JRA1J1.28 Software distributed correlation33 PPU
D109JRA1J1.29First fringes Grid correlator34 DPU
D110JRA1J1.30 First fringes on FABRIC35 DPU
D111NA1NA1.03 Annual report (incl. Financial information) to EC 36 RPP
D112NA1NA1.04 Final Report to Board and EC 36 RPP
D113NA1NA1.05 Final Plan for using and disseminating knowledge36 RPP
D114NA1NA1.06Implementation of the Gender Action Plan36 RPP
D115NA1NA1.07Raising public participation and awareness 36 RPU
D116NA2NA2.07NA2 annual & Final reports 36 RPP
D117NA4NA4.07 e-VLBI Demonstration and attendance at network events. 36 OPU
D118JRA1J1.31Final report36 RPU

NOTES ON COLUMNS

“Status”

 The status of the deliverable on a 0 to 4 scale.
 x = Ongoing effort
 4 = Deliverable completed and presented to Project Manager
 3 = Deliverable in draft form
 2 = Most work completed
 1 = Some work started
 0 = No work started
 --> = Deliverable has been identified as actively delayed

“Nature”

 R = Report
 P = Prototype
 D = Demonstrator
 O = Other

“Dissemination Level”

 PU = Public
 PP = Restricted to other programme participants (including the Commission Services).
 RE = Restricted to a group specified by the consortium (including the Commission Services).
 CO = Confidential, only for members of the consortium (including the Commission Services).
1)
Document is in final form, but has not yet been uploaded to the wiki. Once uploaded, the deliverable will be considered complete