NEXPReS Project Deliverables

Looking for the milestones table? For deliverables completed during Period 1, see the separate section at the bottom of this page.

Remaining Deliverables

D# Title Partner Due (month) Status
D1.10 Period 2 Report to EC 1 24 4
D1.11 Period 3 Report to EC 1 36 2
D2.03 EVN-NREN meeting 3 12 32 4
D3.02 eVSAG meeting 2 minutes 8 32 4
D4.03 Meeting Support: Photos of the Display 1 36 4
D5.09 Control systems and scheduling mechanisms for 4-Gbps at correlator:The EVN Experiment Database, The Correlator Control System Database,JIVE NEXPReS Network Upgrade, Buffering eVLBI data streams, 4 Gbit/s correlation using the SFXC software correlator 1 23 4
D5.10 Corner-turning platform 1 24 4
D5.11 eRemoteCtrl and NASA Field System Interaction 14 28 4
D5.12 Automated delayed correlation: Automated job scheduling; Tarball of job scheduling software; Tarball of python runjob script needed for automated scheduling 1 29 4
D5.13 Real-time correlation with simultaneous recording at the correlator, Tarball of version of Jive5ab code with correlation/recording capability 1 30 4
D5.14 Report on tests with Wettzell & Effelsberg stations 14 36 4
D5.15 Streamlined data reduction pipelines & user access tgz codeball 1 36 4
D6.02 Operational use of BoD on at least one e-VLBI connection 1 36 4
D6.04 BoD scheduling interface for LTA 1 30 4
D6.05 Demonstration of BoD for an operational LTA 1 33 4
D6.06 Demonstration of integrated BoD testing and validation (UMAN WP6 Year 1 report.pdf) 1 30 4
D6.08 Demonstration of international BoD connectivity at 10 Gbps 1 30 4
D7.06 Demo of real-time correlation 1 34 4
D7.07 Demo of global correlation 1 36 4
D8.08 Design document of integration system of allocation methods with transparent multi-Gbps access 1 26 4
D8.09 Integration test report of LTA and pipeline integration and appendix 2 32 4
D8.10 Demonstration tests of the integrated system (ODT) 1 32 4
D8.11 Final report on Networked Storage on Demand 13 35 4

Deliverables Completed During Period 2

D# Title Partner Due (month) Status
D1.05 Conclude Consortium Agreement (status of signatures) 1 17 1 4
D1.09 Period 1 Report to EC 1) 1 12 4
D2.02 EVN-NREN meeting 2 12 22 4
D2.04 Presentation on regions of increasing interest to Radio Astronomy and Networking ppt, 26MB pdf, optimized, 5MB ppt update: rev3 12 19 4
D3.01 eVSAG meeting 1- meeting wiki page meeting minutes 8 16 4
D4.07 Publish Print Items Low-res PDF Movie 1 23 4
D5.02 Metrics, selection criteria and user feedback: D5.2 PDF Addendum 1 Addendum 2 Addendum 3 1 4 4
D5.04 Automated job scheduling:Disk unit reservation system,GUI for starting different correlator systems, 2011,Merging ’domino’ into ’jive5ab’, Tarball of Disk unit reservation system code, Tarball of correlator systems GUI code 1 19 9 4
D5.05 VDIF Mark5 conversion software ( A MarkIV format to vdif data converter ) 1 15 4
D5.06 Control systems and scheduling mechanisms for 4-Gbps recording equipment Report on visit to Haystack Observatory Control systems and scheduling mechanisms for 4Gbps recording equipment 1 18 4
D5.07 Unattended correlation Automated monitoring triggers Continuous Automated Intelligent Monitory system overview Tarball of GUI and Zabbix configuration for Automated monitoring triggers CAIM Correlator Monitoring Server Tarball of CAIM server code 1 19 4
D5.08 Monitoring, remote control and client software including the authorization and authentication layer software and documentation (~30 MB). Additional information available on http://www.econtrol-software.de/ 14 22 4
D6.01 Proof-of-concept system for reserving and provisioning On-demand networking capacity (Draft M6.01 document and NSI Client draft ). Final Report PDF and supporting software (requester, simulation) 1 20 4
D6.03 Configuration of 10 Gbps BoD for the LOFAR archive network (pdf) 1 24 4
D6.07 Demonstration of international BoD connectivity at 4 Gbps (PDF ) 1 18 4
D7.03 Workflow Manager implementation (PSNC): initial reports (Web Portal and Technology Overview PDF, Workflow Languages Overview PDF), final report (PDF) 11 18 4
D7.04 Demo of automated correlation (PDF) 1 24 4
D7.05 Real-time middleware components PDF (code tarball note: 175 MB) 11 24 4
D8.03 Design document of storage element allocation methods (INAF) [ PDF ] 3 16 10 4
D8.04 Design document of transparent local/remote application programming interface for storage elements (Aalto) ODT, PDF 13 17 15 4
D8.05 Performance and integration test report of simultaneous I/O storage elements (PDF) 6 21 4
D8.06 Test report of storage element allocation methods (PDF) 3 22 4
D8.07 Test report of transparent local/remote application programming interface for storage elements pdf (updated) (UMAN) 5 22 4

Deliverables Completed During Period 1

D# Title Partner Due (month) Status
D1.01 Appoint Programme Manager 1 1 4
D1.02 Appoint Project Assistant 1 1 4
D1.03 Form Board (protected due to email addresses) 1 1 4
D1.04 Create Project contact lists (multiple lists collected on that page) 1 1 4
D1.06 Form Management Team 1 1 4
D1.07 Convene Advisory Board 1 3 4
D1.08 Convene Management Team 1 3 4
D2.01 EVN-NREN meeting 1 12 9 4
D4.01 Communications Manager Appoint 1 1 4
D4.02 Online Resources: website, wiki 1 1 4
D4.04 Display 1 3 4
D4.05 Visual Guide/Elements 1 6 4
D4.06 Publish Print Items (low-res PDF) 1 9 4
D4.08 Project “Fact Sheet” (JIVE) 1 1 4
D5.01 Mixed e-VLBI/recorded-VLBI at stations jive5ab tarball 1 3 4
D5.03 Definitions of specifications monitoring and remote control 14 4 4
D7.01 Workflow Manager requirements from telescope operators DOC PDF (OSO) 6 4 4
D7.02 Workflow Manager requirements from correlator operators PDF file (JIVE) 1 4 4
D8.01 Interface design document of storage element API (AALTO) (PDF, ODT) 13 6 4
D8.02 Hardware design document for simultaneous I/O storage elements (AALTO) (PDF, ODT) 13 8 4

Notes

“Status Column”

 The status of the deliverable on a 0 to 4 scale.
 x = Ongoing effort
 4 = Deliverable completed and presented to Project Manager
 3 = Deliverable in draft form
 2 = Most work completed
 1 = Some work started
 0 = No work started
 --> = Deliverable has been identified as actively delayed

2010 Nov 24- this page had a notable modification in which a few columns were removed. They were mostly redundant data and info that made the page hard to read. Xref the changelog for today to see the removed info.

1) accepted by the EC via email of 25 Oct 2011
nexpres/nexpres-deliv-table-1.txt · Last modified: 2013/09/02 10:20 by tcyun
 
Except where otherwise noted, content on this wiki is licensed under the following license: CC Attribution-Share Alike 3.0 Unported
Recent changes RSS feed Donate Powered by PHP Valid XHTML 1.0 Valid CSS Driven by DokuWiki