NEXPReS Fourth Quarterly Report (April-June 2011) -- DRAFT --

Final text for the Fourth Quarterly Report is due Fri 24 Jun 2011

Note, that this quarterly report will evolve into the full Annual Report that we submit to the Commission for our Period 1 Review.

Introduction / Project Summary

Summary

This is the report for the end of the XX period (months #-#).

Overall Deliverables Status and Timeline

Link to the Deliverables Table

Deliverables due during the XX reporting quarter:

D# Month Due
D8.02 Hardware design document for simultaneous I/O storage elements (AALTO) 8
D2.01 EVN-NREN meeting 1 9
D4.06 Publish Print Items (see section “2011 March Brochure ”) 9
D5.04 Automated job scheduling 9

The following deliverables were submitted to and their receipt acknowledged by the Commission during this quarter:

Deliverable Number and Description confirmed on 1)
D5.2 Metrics, selection criteria and user feedback 11 Jan 2011
D7.1 Workflow Manager requirements from telescope operators 04 Jan 2011
D7.2 Workflow Manager requirements from correlator operators 25 Jan 2011
D8.1 Interface design document of storage element API 25 Jan 2011
D8.2 Hardware design document for simultaneous I/O storage elements 8 Mar 2011

WP 1 - Management

Activities of Note

internal prep for annual report

  • date selected: 2011 Sep 08 Thu
  • presentation group identified: Huib, Ralph, Charles, Arpad, Ari, Yvonne (6 total)

Deliverables Status Update

WP hosted meetings

support for Aveiro meeting, participation by EC, NEXPReS, JIVE and e-VLBI community.

Publications, Presentations and Talks

travel to TNC2011

WP 2 - EVN-NREN

Activities of Note

Deliverables Status Update

WP hosted meetings

Publications, Presentations and Talks

WP 3 - eVSAG

Activities of Note

Deliverables Status Update

WP hosted meetings

Publications, Presentations and Talks

WP 4 - Communications

Activities of Note

  • Support was provided by WP4 for the workshop “The Growing Demand on Connectivity and Information Processing in RadioAstronomy from VLBI to SKA” (VLBI2SKA) in Aveiro, Portugal, in May.
  • The NEXPReS display was installed at the VLBI2SKA workshop . Efforts have been made to send the display to other major astronomy and networking conferences, but exhibit and shipping costs were prohibitively expensive.
  • Brochures were on exhibit at VLBI2SKA (Aveiro, May), EGI User Forum (Vilnius, April 2011), TNC2011 (Prague, May 2011) and EUNIS (Dublin, June 2011).
  • Although not an official NEXPReS deliverable, the Public Outreach Office has been working this quarter on a video that will, among other things, provide a visual explanation of e-VLBI which can be used in presentations and other outreach activities.

Deliverables Status Update

There were no deliverables due for WP4 in this period.

WP hosted meetings

No meetings are necessary for this work package.

Publications, Presentations and Talks

Publications and presentations are not usually made under this work package, but those from other work packages this quarter have been posted to the Papers and Presentations page on the project web site.

WP 5 - Cloud Correlation

Activities of Note

Deliverables Status Update

WP hosted meetings

Publications, Presentations and Talks

WP 6 - High Bandwidth on Demand

Activities of Note

Deliverables Status Update

WP hosted meetings

Publications, Presentations and Talks

WP 7 - Computing in a Shared Infrastructure

Activities of Note

Deliverables Status Update

WP hosted meetings

Publications, Presentations and Talks

WP 8 - Provisioning High-Bandwidth, High-Capacity Networked Storage on Demand

Activities of Note

Preparation for the Period Review

Deliverables Status Update

WP hosted meetings

* support for SKA/e-VLBI, NEXPReS WP6/7/8 meeting; Aveiro, PT * support for INGRID 2011, xref WP3

Publications, Presentations and Talks

* TERENA 2011, Prague, CZ * SKA/e-VLBI, NEXPReS WP6/7/8 meeting; Aveiro, PT