NEXPReS Period 1 Project Report Documents Main Page

This is the main page for the (to be) written report and its sub sections.

If you want logistical information about the P1 meeting we will have in Brussels, go here instead.

Work Timeline

note: assuming that things are due/sent out on the Tuesday of the listed week.

  2011  Su Mo Tu We Th Fr Sa | Report Writing Column                     | Financial (Form C) Column  
   Jun            1  2  3  4 |                                           | 
         5  6  7  8  9 10 11 |                                           | 
        12 13 14 15 16 17 18 | telecon 1.                                | 
                             | start writing                             | 
        19 20 21 22 23 24 25 | P1 Report Text                            | 
   Jul  26 27 28 29 30  1  2 |                                           | 
         3  4  5  6  7  8  9 |                                           | 
        10 11 12 13 14 15 16 | first text to TCY (via wiki?)             | 
        17 18 19 20 21 22 23 | draft 1: TCY to Activity Leaders (.doc)   | 
        24 25 26 27 28 29 30 | revisions to TCY.                         | 
                             | telecon                                   | 
   Aug  31  1  2  3  4  5  6 | draft 2 to All NEXPReS (.doc)             | First draft of Form C into system
         7  8  9 10 11 12 13 | final input rcvd                          | > revision cycle
        14 15 16 17 18 19 20 | board approves near-final text via email  | > revision cycle
                             | telecon                                   |
        21 22 23 24 25 26 27 | final text of report shared (.doc)        | All Form C's in the system and done 
                             | thu: email/upload docs to Brussels        |
   Sep  28 29 30 31  1  2  3 |                                           |  
         4  5  6  7  8  9 10 | NEXPReS Period 1 Review, Brussels         |  
        11 12 13 14 15 16 17 |                                           |  
        18 19 20 21 22 23 24 |                                           |  
        25 26 27 28 29 30    |                                           |  
  2011  Su Mo Tu We Th Fr Sa |                                           |  

P1 Report Overview

responsible % status Description
TCY 0 % Publishable Summary
HJvL 0 % Overall Project Objectives
TCY 0 % Overall Work progress and achievements during the period
RH-J 0 % WP2 EVN-NREN
PC 0 % WP3 eVSAG
KSY 0 % WP4 Communication
AS 0 % WP5 Cloud Correlation
EPB 0 % WP6 High Bandwidth on Demand
MK 0 % WP7 Computing in a Shared Infrastructure
AM 0 % WP8 High-Bandwidth, High-Capacity Storage
TCY 0 % WP1 Project Management
TCY+ 0 % Deliverables Table
TCY+ 0 % Milestones Table
TCY 0 % Explanation of Resources by Partner (personnel, and major cost items)
0 % JIVE
0 % ASTRON
0 % INAF
0 % MPG
0 % UMAN
0 % OSO
0 % VENT
0 % FG-IGN
0 % NorduNet
0 % SURFnet
0 % PSNC
0 % DANTE
0 % AALTO
0 % TUM
0 % CSIRO
TCY 0 % Form C Financial Documents
0 % JIVE
0 % ASTRON
0 % INAF
0 % MPG
0 % UMAN
0 % OSO
0 % VENT
0 % FG-IGN
0 % NorduNet
0 % SURFnet
0 % PSNC
0 % DANTE
0 % AALTO
0 % TUM
0 % CSIRO
TCY 0 % Summary Financial Report (.xls table)

Sample Text

This is a link to the EXPReS P1 Report just so that you have something against which you can compare and use as a comparison point. Note, the actual report is about 50% into the linked document (and it is a long document); all period reports are submitted as annexes to the original contract. Search for “Technical Annex 1: Second Period Plan” or go to page 201 of the PDF.