Deliverables

Deliverable #Activity #Deliverable title Lead Participant Planned Delivery month Actual Delivery Month Current Status
D1NA4Creation of Public EXPReS web-site JIVE2
D2JRA1Data acquisition requirements documentMRO2
D3JRA1Protocols strategic documentJBO2
D4NA2EVN-NREN meeting No. 1 (under auspices of EXPReS)DANTE3
D5SA1Central data link controlJIVE3
D6NA3First meeting of eVSAG under auspices of EXPReSOSO4
D7NA4Creation of EXPReS web-based management toolsJIVE4
D8JRA1Visualization softwareJIVE4
D9JRA1Correlator design specificationJIVE5
D10NA4Generation of PR material (phase 1) 6
D11SA1Job preparation utilitiesJIVE6
D12SA1Fast/adaptive scheduling toolsJIVE6
D13SA2Feasibility study of the last-mile connection to the nearest GÉANT node for participant CNIG-IGNCNIG-IGN6
D14SA2Feasibility study of the last-mile connection to the nearest GÉANT node for participant MPIfRMPIfR6
D15SA2Equipment of the last-mile infrastructure for participant INAF (telescope in Medicina)INAF6
D16SA2Feasibility study of the last-mile connections to the nearest GÉANT node for participant CAS (Shanghai, Urumqi, Miyun, Yunnan )CAS6
D17SA2Feasibility study of the last-mile connection to the nearest GÉANT node for participant VIRACVIRAC6
D18SA2Feasibility study of the last-mile connection to the nearest GÉANT node for participant HRAOHRAO6
D19SA2Feasibility study of the last-mile connection to the nearest GÉANT node for participant NAIC (Arecibo)NAIC6
D20SA2Feasibility study of the last-mile connection to the nearest GÉANT node for participant TIGOTIGO6
D21SA2Feasibility study of the last-mile connection to AARNET for participant CSIROAARNET6
D22JRA1Overall design documentALL6
D23JRA1eVLBI-Grid design documentPSNC6
D24JRA1eVLBI fringes PC-EVNOSO7
D25JRA1LOFAR connection strategic documentASTRON7
D26JRA1Data acquisition design documentMRO8
D27SA1eMERLIN VSI interfaces designUniMan9
D28SA1Selective data processor controlsJIVE9
D29SA2e-VLBI test observations, MedicinaINAF10
D30JRA1eVLBI-Grid interface documentOSNC10
D31NA2NA2 annual report No. 2 (as part of EXPReS Ann. Rep No. 2)JIVE24
D32NA1Annual report (incl. Financial information) to ECJIVE12
D33NA2NA2 annual report No. 1 (as part of EXPReS Ann. Rep No. 1)JIVE12
D34NA4e-VLBI Demonstration and attendance at Network events.JIVE12
D35SA1Network protocol decisionJIVE12
D36SA1Monitored information handling modulesJIVE12
D37SA2Equipment of the last-mile infrastructure for participant MROMRO12
D38SA2Construction and equipment of the last-mile infrastructure for participant CNIG-IGNCNIG-IGN12
D39SA2Construction and equipment of the last-mile infrastructure for participant MPIfRMPIfR12
D40SA1Monitoring processesJIVE12
D41JRA1Protocols performance reportJBO13
D42JRA1Software correlator coreJIVE14
D43JRA1Software data productJIVE15
D44SA1Real-time data processor control softwareJIVE15
D45SA1Tests using local Jodrell Bank home e-MERLIN telescopeUniMan15
D46NA3eVSAG meeting No. 2OSO16
D47SA1Real-time PipelineJIVE16
D48NA2EVN-NREN meeting No. 2JIVE18
D49NA4Generation of new PR material (phase 2)DANTE18
D50SA1Visibility monitorJIVE18
D51SA1Tested software for operational improvementsJIVE18
D52SA1Test using remote e-MERLIN telescopeUniMan18
D53SA1VSI support softwareJIVE18
D54SA1VSI InterfacesJIVE12
D55SA210 Gbps link upgrade between MERLIN and JIVEMERLIN, JIVE18
D56SA2e-VLBI test observations, MetsahoviMRO18
D57SA2Construction and equipment of the last-mile infrastructure for participant ShanghaiCAS18
D58SA2Construction and equipment of the last-mile infrastructure in AARNET to allow connection of participant CSIROAARNET, CSIRO18
D59SA2Construction and equipment of the last-mile infrastructure for participant UrumqiCAS18
D60SA2Construction and equipment of the last-mile infrastructure for participant MiyunCAS18
D61SA2Construction and equipment of the last-mile infrastructure for participant KunmingCAS18
D62SA2Construction and equipment of the last-mile infrastructure for participant VIRACVIRAC18
D63SA2Equipment of the last-mile infrastructure for participant NAICNAIC18
D64SA2Construction and equipment of the last-mile infrastructure for participant TIGOTIGO18
D65SA2AARNET connectivity enhancementsAARNET18
D66JRA1Data acquisition interface documentMPI18
D67JRA1LOFAR station interface reportASTRON18
D68JRA1Software for workflow managementPSNC18
D69SA2Feasibility study of the last-mile connection to the nearest GÉANT node for participant INAF (Sardinia)INAF20
D70SA210 Gbps link between UniMan and OSO for ultra-VLBI testsUniMan, OSO20
D71SA1Flexible local GE networkJIVE21
D72SA2e-VLBI test observations, EffelsbergMPIfR21
D73SA2e-VLBI test observations, MetsahoviATNF22
D74SA2e-VLBI test observations, YebesOAN22
D75JRA1Software for correlation on clusterJIVE23
D76JRA1Data acquisition test reportMPI23
D77JRA1Data acquisition prototype at telescopeOSO23
D78JRA1Overall broadband demonstrationJIVE23
D79JRA1Software cluster correlationJIVE23
D80JRA1First fringes software correlatorJIVE23
D81NA1Annual report (incl. Financial information) to ECJIVE24
D82NA2NA2 annual report No. 2 (as part of EXPReS Ann. Rep No. 2)JIVE24
D83NA4e-VLBI Demonstration and attendance at Network events. 24
D84SA1Network monitoring toolsJIVE24
D85SA1Multiple e-MERLIN telescope testsUniMan24
D86SA2Construction and equipment of the last-mile infrastructure for participant HartRAOHRAO24
D87JRA1Software to collect distributed outputJIVE24
D88NA2EVN-NREN meeting No. 3DANTE26
D89NA2EVN-NREN representatives present EXPReS networking results at the e-VLBI Science & Technology Workshop DANTE26
D90NA2EVN-NREN meeting DANTE
D91NA3eVSAG meeting No. 3OSO26
D92JRA1Software to create data product from distributed correlation JIVE27
D93JRA1Software routingPSNC29
D94NA3e-VLBI Workshop held in Onsala 30
D95SA1Improved network applicationsJIVE30
D96SA1Monitoring user interfacesJIVE30
D97SA2e-VLBI test observations, UrunqiCAS30
D98SA2e-VLBI test observations, MijunCAS30
D99SA2e-VLBI test observations, KunmingCAS30
D100SA2e-VLBI test observations, VIRACVIRAC30
D101SA2e-VLBI test observations, HRAOHRAO30
D102SA2e-VLBI test observations, NAIC, AreciboNAIC30
D103SA2e-VLBI test observations, TIGOTIGO30
D104SA2Construction and equipment of the last-mile infrastructure for participant INAF (Sardinia)INAF30
D105JRA1eMERLIN interface availableJBO30
D106JRA1Fringes with new routingJIVE31
D107NA3Publication of e-VLBI Workshop proceedingsOSO32
D108JRA1Software distributed correlationJIVE33
D109JRA1First fringes Grid correlatorJIVE34
D110JRA1First fringes on FABRICJIVE35
D111NA1Annual report (incl. Financial information) to ECJIVE36
D112NA1Final Report to Board and ECJIVE36
D113NA1Final Plan for using and disseminating knowledgeJIVE36
D114NA1Implementation of the Gender Action PlanJIVE36
D115NA1Raising public participation and awarenessJIVE36
D116NA2NA2 annual & Final reports JIVE36
D117NA4e-VLBI Demonstration and attendance at network events.JIVE36
D118JRA1Final reportJIVE36