User Tools

Site Tools


expres:fabric

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
expres:fabric [2012/12/11 11:15] jive_adminexpres:fabric [2012/12/11 11:17] (current) jive_admin
Line 33: Line 33:
     * 2009 April 15: Face to Face meeting, Dwingeloo.  [[Minutes-2009-04-15]] and {{expres:1_internal_meeting-15.04.2009.pdf|Slides}}.  (Note: this was the initial meeting that establishes the on site work of Dominik at JIVE for approx 8 weeks.)      * 2009 April 15: Face to Face meeting, Dwingeloo.  [[Minutes-2009-04-15]] and {{expres:1_internal_meeting-15.04.2009.pdf|Slides}}.  (Note: this was the initial meeting that establishes the on site work of Dominik at JIVE for approx 8 weeks.) 
   * 2008 September 1: FABRIC face to face meeting, Poznan.  Minutes {{expres:2008-sep-fabric_minutes_2.pdf|pdf}}   * 2008 September 1: FABRIC face to face meeting, Poznan.  Minutes {{expres:2008-sep-fabric_minutes_2.pdf|pdf}}
-  * 2007 November 30: WP1.1 telecon [{{fabric:2007-11-30_minutes.pdf|minutes}}]+  * 2007 November 30: WP1.1 telecon [{{:expres:fabric:2007-11-30_minutes.pdf|minutes}}] 
   * [[wp1_2007sep_mtg|2007 September 20]]: Collaboration meeting, held in conjunction with the [[http://www.mpifr.de/old_mpifr/div/vlbi/6th_evlbi/index.html|International e-VLBI Workshop]] in Bonn   * [[wp1_2007sep_mtg|2007 September 20]]: Collaboration meeting, held in conjunction with the [[http://www.mpifr.de/old_mpifr/div/vlbi/6th_evlbi/index.html|International e-VLBI Workshop]] in Bonn
   * 2007 April 25-26: Business meeting at {{:expres:fabric:minutesfabricmeeting-04-2007.pdf|JIVE minutes}}   * 2007 April 25-26: Business meeting at {{:expres:fabric:minutesfabricmeeting-04-2007.pdf|JIVE minutes}}
expres/fabric.txt · Last modified: 2012/12/11 11:17 by jive_admin