Final text for the XXth Quarterly Report is due ddd DD MMMM YYYY
This is the report for the end of the XX period (months #-#).
Link to the Deliverables Table
Deliverables due during the XX reporting quarter:
D# | Month Due |
---|---|
D8.02 Hardware design document for simultaneous I/O storage elements (AALTO) | 8 |
D2.01 EVN-NREN meeting 1 | 9 |
D4.06 Publish Print Items (see section “2011 March Brochure ”) | 9 |
D5.04 Automated job scheduling | 9 |
The following deliverables were submitted to and their receipt acknowledged by the Commission during this quarter:
Deliverable Number and Description | confirmed on 1) |
---|---|
D5.2 Metrics, selection criteria and user feedback | 11 Jan 2011 |
D7.1 Workflow Manager requirements from telescope operators | 04 Jan 2011 |
D7.2 Workflow Manager requirements from correlator operators | 25 Jan 2011 |
D8.1 Interface design document of storage element API | 25 Jan 2011 |
D8.2 Hardware design document for simultaneous I/O storage elements | 8 Mar 2011 |