====== NEXPReS Project Deliverables ====== ^ D# ^ Title ^ Partner ^ Due (month) ^ Status ^ | D1.1 | [[nexpres:management_team|Appoint Programme Manager]] | 1 | 1 | 4 | | D1.2 | [[nexpres:management_team|Appoint Project Assistant]] | 1 | 1 | 4 | | D1.3 | [[nexpres:nexpres_protected:nexpres_mailinglist_board|Form Board]] (protected due to email addresses) | 1 | 1 | 4 | | D1.4 | [[nexpres:nexpres_wp1|Create Project contact lists]] (multiple lists collected on that page) | 1 | 1 | 4 | | D1.5 | Conclude Consortium Agreement | 1 | 1 | 3 | | D1.6 | [[nexpres:management_team|Form Management Team]] | 1 | 1 | 4 | | D1.7 | [[nexpres:board_meeting_kickoff_meeting_20_september_2010|Convene Advisory Board]] | 1 | 3 | 4 | | D1.8 | [[nexpres:nexpres_mt_telecon_2010-08|Convene Management Team]] | 1 | 3 | 4 | | D1.9 | Period 1 Report to EC | 1 | 12 | 0 | | D1.10 | Period 2 Report to EC | 1 | 24 | 0 | | D1.11 | Period 3 Report to EC | 1 | 36 | 0 | | D2.1 | EVN-NREN meeting 1 | 12 | 9 | 0 | | D2.2 | EVN-NREN meeting 2 | 12 | 22 | 0 | | D2.3 | EVN-NREN meeting 3 | 12 | 32 | 0 | | D2.4 | Presentation on regions of increasing interest to Radio Astronomy and Networking | 12 | 19 | 0 | | D3.1 | eVSAG meeting 1 | 8 | 16 | 0 | | D3.2 | eVSAG meeting 2 | 8 | 32 | 0 | | D4.1 | [[http://www.jive.nl/dokuwiki/doku.php?id=nexpres:management_team|Communications Manager Appoint]] | 1 | 1 | 4 | | D4.2 | Online Resources: [[http://www.nexpres.eu/|website]], [[http://www.jive.nl/dokuwiki/doku.php?id=nexpres:project|wiki]] | 1 | 1 | 4 | | D4.3 | Meeting Support | 1 | 36 | 0 | | D4.4 | [[nexpres:communications:display|Display]] | 1 | 3 | 4 | | D4.5 | [[nexpres:communications:visualguide|Visual Guide/Elements]] | 1 | 6 | 4 | | D4.6 | Publish Print Items ({{:nexpres:communications:d_4_6_printitems_lowres.pdf|low-res PDF}}) | 1 | 9 | 4 | | D4.7 | Publish Print Items | 1 | 23 | 0 | | D4.8 | {{:nexpres:communications:master_fact_sheet_cp-csa_nexpres_revised.pdf|Project “Fact Sheet”}} (JIVE) | 1 | 1 | 4 | | D5.1 | [[nexpres:nexpres_wp5#flexible_buffering_jive_aalto|Mixed e-VLBI/recorded-VLBI at stations]] {{:nexpres:jive5ab.tar.gz|jive5ab tarball}} | 1 | 3 | 4 | | D5.2 | Metrics, selection criteria and user feedback ({{:nexpres:nexpres_d5.2.pdf|PDF}}) | 1 | 4 | 4 | | D5.3 | {{:nexpres:20101004RoadmapWP5Task3_v2.doc|Definitions of specifications monitoring and remote control}} | 14 | 4 | 4 | | D5.4 | Automated job scheduling | 1 | 9 | 0 | | D5.5 | VDIF Mark5 conversion software | 1 | 15 | 0 | | D5.6 | Control systems and scheduling mechanisms for 4-Gbps recording equipment | 1 | 18 | 0 | | D5.7 | Unattended correlation | 1 | 19 | 0 | | D5.8 | Monitoring, remote control and client software including the authorization and authentication layer | 14 | 22 | 0 | | D5.9 | Control systems and scheduling mechanisms for 4-Gbps at correlator | 1 | 23 | 0 | | D5.10 | Corner-turning platform | 1 | 24 | 0 | | D5.11 | FS-integrated remote control system | 14 | 28 | 0 | | D5.12 | Automated delayed correlation | 1 | 29 | 0 | | D5.13 | Real-time correlation with simultaneous recording at the correlator | 1 | 30 | 0 | | D5.14 | Report on tests with Wettzell & Effelsberg stations | 14 | 36 | 0 | | D5.15 | Streamlined data reduction pipelines & user access | 1 | 36 | 0 | | D6.1 | Proof-of-concept system for reserving and provisioning On-demand networking capacity | 1 | 20 | 0 | | D6.2 | Operational use ofBoDonat least one e-VLBI connection | 1 | 36 | 0 | | D6.3 | Configuration of 10 Gbps BoD for the LOFAR archive network | 1 | 24 | 0 | | D6.4 | BoD scheduling interface for LTA | 1 | 30 | 0 | | D6.5 | Demonstration of BoD for an operational LTA | 1 | 33 | 0 | | D6.6 | Demonstration of integrated BoD testing and validation | 1 | 30 | 0 | | D6.7 | Demonstration of international BoD connectivity at 4 Gbps | 1 | 18 | 0 | | D6.8 | Demonstration of international BoD connectivity at 10 Gbps | 1 | 30 | 0 | | D7.1 | Workflow Manager requirements from telescope operators {{:nexpres:wp7_d7.1_oso_2010-11-10.doc|DOC}} {{:nexpres:wp7_d7.1_oso_2010-11-10.pdf|PDF}} (OSO) | 6 | 4 | 4 | | D7.2 | Workflow Manager requirements from correlator operators (JIVE) | 1 | 4 | 4 | | D7.3 | Workflow Manager implementation (PSNC) | 11 | 18 | 1 | | D7.4 | Demo of automated correlation (JIVE/OSO/ PSNC/VENT) | 1 | 24 | 0 | | D7.5 | Real-time middleware components (PSNC) | 11 | 24 | 0 | | D7.6 | Demo of real-time correlation (JIVE/OSO/ PSNC) | 1 | 34 | 0 | | D7.7 | Demo of global correlation (JIVE/OSO/ PSNC/CSIRO) | 1 | 36 | 0 | | D8.1 | Interface design document of storage element API (AALTO) ({{:nexpres:2010-12-21_wp8-d8.1.pdf|PDF}}, {{:nexpres:2010-12-21_wp8-d8.1.odt|ODT}}) | 13 | 6 | 4 | | D8.2 | Hardware design document for simultaneous I/O storage elements (AALTO) ({{:nexpres:2011-02-28_wp8-d8.2.pdf|PDF}}, {{:nexpres:2011-02-28_wp8-d8.2.odt|ODT}}) | 13 | 8 | 4 | | D8.3 | Design document of storage element allocation methods (INAF) | 3 | 10 | 0 | | D8.4 | Design document of transparent local/remote application programming interface for storage elements (UMan) | 13 | 15 | 0 | | D8.5 | Performance and integration test report of simultaneous I/O storage elements (OSO) | 6 | 21 | 0 | | D8.6 | Test report of storage element allocation methods (INAF) | 3 | 22 | 0 | | D8.7 | Test report of transparent local/remote application programming interface for storage elements (UMAN) | 5 | 22 | 0 | | D8.8 | Design document of integration system of allocation methods with transparent multi-Gbps access (JIVE) | 1 | 26 | 0 | | D8.9 | Integration test report of LTA and pipeline integration (ASTRON) | 2 | 32 | 0 | | D8.10 | Demonstration tests of the integrated system (JIVE) | 1 | 32 | 0 | | D8.11 | Final report on Networked Storage on Demand (AALTO) | 13 | 35 | 0 | Note: 2010 Nov 24- this page had a notable modification in which a few columns were removed. They were mostly redundant data and info that made the page hard to read. Xref the changelog for today to see the removed info.